01732 866731 [email protected]

OPTIMUS POINT – BODEN

Key Project Details  

          • System Size – 1 MWp
          • Panel Model – JA Solar
          • Inverter Models – 9x SolarEdge Inverters
          • 2, 938 PV Modules
          • 230 tonnes CO2 avoided per year

OPTIMUS POINT – BODEN 

As the leading provider of renewable energy SAS ENERGY were chosen to create cost-effective, sustainable solution for this project at OPTIMUS POINT – BODEN.

SAS ENERGY guarantee their clients saving on energy through efficient and intelligent solar PV solutions. Each and every project is tailored to client’s specific needs, offering their users recycled – sustainable green energy.

At this particular project at Boden SAS ENERGY installed commercial roof-top solution with 2,938 PV Modules covering the area of 4,942.2 m2. This solar PV system generates yearly 1 MWp of green energy and eliminates 230 tonnes of CO2 emissions per calendar year. 80% of the generated power will be consumed locally.

Moreover, it was really important to install the project without disturbance and in sync with the occupiers as both locations DPD and Boden are on a tight and busy schedule. SAS has proved again the high level of competence and professionalism by meeting all the demands and delivering the project in time and within budget.

*Please update your cookie preferences to view this content.

“We are delighted that we are involved in this renewable energy project.

This huge 250,000 ft2 building rooftop solar PV solution comes under the sustainability strategy that we call ‘Doing the right thing’.

We are using the beautiful sun’s free energy to reduce this building’s energy usage we hope by as much as 50%”.

 

Ben Dryer, Operations Director, Boden

We chose SAS ENERGY as a main contractor for this project because of their ability to deliver even the most technical projects on time, within budget and most importantly safely.”

 

John Macdonald-Brown, CEO, SYZYGY

 

 

CALL US

01732 866731